Frontier Communications

This newly finished Tenant Build out included over 54,000 square foot of open office. Performing this build out in under 12 weeks. The project included integration of a new 750 kW Generator, and a 225 kVA and 160 kVA UPS system into the existing electrical service. The entire buildings power is backed up on the generator, with all workstation power served through the UPS systems. The redundant power source serves the two server locations on site. The complete buildout includes all LED lighting, controlled by a networked room control system for both entire area and independent control. We provided complete communication system and A/V system.

Tenant Finish
Corporate Offices

Project Details

  • Location: Frontier Communications 1855 W 500 N, Lindon, UT 84042
  • Project Manager: Josh Kitt
  • Date of Completion: December 2015
  • Contracting Company: Big-D Construction