AMT Laboratories

AMT Labs was a fast track project. It consisted of a 77,400 square foot addition that featured a two story office space, storage area, labs and production area. The production area included mixing rooms, a large oven for drying the products and grinding rooms. A large dust collection system was installed in the grinding rooms.

Project Details

  • Location: 536 N 700 W, North Salt Lake, UT 84054
  • Duration of Project: 12 Months
  • Estimator & Project Manager: Jeff Otto
  • Project Delivery Type: Design/ Build
  • Contracting Company: Layton Construction