AMT Laboratories

Project Details

Location: 536 N 700 W, North Salt Lake, UT  84054
Duration of Project: 12 Months
Estimator & Project Manager: Jeff Otto

Contracting Company: Layton Construction
Project Delivery Type: Design/ Build

AMT Labs was a fast track project. It consisted of a 77,400 square foot addition that featured a two story office space, storage area, labs and production area. The production area included mixing rooms, a large oven for drying the products and grinding rooms. A large dust collection system was installed in the grinding rooms.