Wasatch High School

Wasatch High School is a 330,000 square foot high school located in Heber City Utah. This school consists of a 2 story brick structure with a lower level gym. The electrical system consisted of 2 3000 amp services placed in opposing locations of the school to help minimize electrical costs and provide a cleaner, more streamlined electrical system. This school was equipped with advanced electrical, communications, sound, audio visual systems, plumbing, heating and air that provided the school’s students with a technologically advanced learning experience that is second to none in this state. In providing these advanced systems, coordination among the various trades, their materials and installation of those materials had to be coordinated in a seamless fashion in order to maintain deadlines and turn over dates of the facility.

Project Details

  • Location: 930 S 500 E, Heber City, UT 84032
  • Size: $6,685,000
  • Contact Name: Matt Noyce
  • Phone Number: 801-568-9090
  • Estimator & Project Manager: Richard Harris
  • Foreman: Joe Brown
  • Electrical Engineer: BNA Engineering of Idaho
  • Delivery Type: Plan/ Spec
  • Date of Completion: June 2011
  • Contracting Company: Layton Construction