University of Utah: Maxwell Wintrobe Research Building

This project included upgrades on the entire building and extensive improvements on four specific floors. The building remained operational throughout the duration of the project. Shutdowns were carefully scheduled to minimize the affect on staff and students. A new 2500A 480V Service was installed for normal power. The Emergency System was upgraded to 800A 480V from the existing Central Plant. New distribution switchboards and branch panels were installed throughout the building. The project also included the complete renovation of three levels of labs. The labs received state-of-the art upgrades in power and systems.

Project Details

  • Location: 26 N Medical Dr, Salt Lake City, UT 84112
  • Size: $1,100,000
  • Owner: University of Utah
  • Contact Name: Heather Soderquist
  • Phone Number: 801-973-0500
  • Estimator & Project Manager: Jeff Otto
  • Foreman: Cameron Murphy
  • Delivery Type: Design/ Assist
  • Date of Completion: August 2010
  • Contracting Company: Jacobsen Construction