Calvin L. Rampton Salt Palace Convention Center Expansion

This project was an addition to the existing Salt Palace structure and was necessitated by the Outdoor Retail Convention held every year. In addition to the 347,000 square feet of exhibit hall space and 106,000 square feet of meeting rooms was a 400 stall underground parking structure. The lighting in the parking structure is supplied via solar panels. There were 163 large concrete utility boxes installed in the exhibit halls that required a detailed layout and installation. They were fed from a six panel configuration at each of the columns. The overall distribution for the addition had one 3000 amp and one 4000 amp 480 volt 3-phase service.

Project Details

  • Location: 100 West Temple, Salt Lake City, UT 84101
  • Size: $1,675,000
  • Duration of Project: 18 Months
  • Contact Name: Mark Bodell
  • Phone Number: 801-550-1952
  • Architect: CLC Associates
  • Estimator & Project Manager: Jeff Otto & Marty Andrus
  • Level of LEED: Gold
  • Date of Completion: June 2009
  • Contracting Company: Bodell Construction